Internet Data CenterComputer Exchange 2 (CX2) Data Center, Cyberjaya
Overview
Development of CX2 Data Center was completed in January 2009. A tier-3 high-end commercial DC which was the largest carrier-neutral high end purpose built commercial DC facility in South East Asia when launch.
Information
Postal Address | 7118, Jalan IMPACT, 63000 Cyberjaya, Selangor, Malaysia |
Gross Floor Area | Approximately 301,000 ft² |
Net Floor Area | Approximately 260,000 ft² DC Space 157,500 ft² |
Raised Floor Load | 10kN/m² in Data Center Area 15kN/m² at M&E Area |
Raised Floor | 1000mm |
Power Density | 30 to 100 W / ft² |
Power Feed | Dual 33kV Incoming Sources |
Electrical Services | High Tension & Low Voltage |
Power Backup | Multiple Backup Power Generator |
Uninterruptible Power Supply | N+1 or N+N Option with 15 Minutes Battery Reserve |
Cooling System | Water-chilled and Air-cooled Systems |
Fire Suppression System | Water Mist System in Data Center and common area. Gas System in mechanical and electrical area |
Occupancy | 100% |
Other | Data cabling and management Multiple Main Distribution Frame facilities Security access controls and intrusion alarms Benchmarked against BCA Greenmark : 69 points |
Available Space | 17,500 ft² |